Week 46 – Winter is falling

Winter is falling

Bathroom

The only part ready in the house is the bathroom ceiling. The walls are ready to be tiled. The floor is ready to have to concrete poured. But first things first.

Stairs

The existing stairs are already decoupled from wall. This after it was freed of the wall boxing it in. Now with all that space opened up, we’re installing a frame in the wall to mount the new stairs on later.

Heating

With the winter coming, I can’t wait for the heating to be installed. The floor needs to be prepared first though. Enough things to do!